Measure rectangles, circles, tree rings, triangles and odd-shaped beds in square feet, with worked examples, so you order the right amount.

Every material calculation starts with the same two numbers: the area in square feet and the depth in inches. Depth is a choice. Area has to be measured, and most beds are not neat rectangles. This guide shows how to measure each shape with a tape, and how close you need to be.

What you need

Measure in feet. Turn inches into a decimal by dividing by 12, so 6 inches is 0.5 feet and 20 feet 6 inches is 20.5 feet.

Inches as a decimal of a foot
Inches123468910
Feet0.080.170.250.330.50.670.750.83

Rectangles and squares

Multiply the length by the width. A bed 24 feet long and 6 feet wide is 144 square feet. At 3 inches deep that needs 1.33 cubic yards.

If the two long sides differ, the bed is not a true rectangle. Measure the width at both ends, add them and divide by two, then multiply by the length.

Circles

Measure straight across the middle at the widest point. That is the diameter. Halve it to get the radius, multiply the radius by itself, then multiply by 3.14.

A round bed 10 feet across has a radius of 5 feet: 5 × 5 × 3.14 = 78.54 square feet. The calculator has a circle option that does this from the diameter.

Rings around trees

A mulch ring is a circle with a hole in the middle. Work out the area of the whole circle, work out the area of the gap you leave around the trunk, and subtract.

A ring 8 feet across with a 2 foot wide bare circle left around the trunk: the outer circle is 50.27 square feet, the bare circle is 3.14, so the ring is 47.12 square feet. At 3 inches that is 11.78 cubic feet.

Triangles

Corner beds are often triangles. Measure one side as the base. Then measure the height from that base to the opposite corner, square to the base. Multiply them and divide by two.

A corner bed with a 12 foot base and an 8 foot height is 12 × 8 ÷ 2 = 48 square feet.

L-shapes and other combinations

Split the area into rectangles on your sketch, work out each one and add them. Make sure no part is counted twice.

An L-shaped bed made of a 20 by 8 foot section and a 10 by 6 foot section is 160 + 60 = 220 square feet. In the project estimator you can enter each section as its own row with the same material, and it adds them for you.

Curved and irregular beds

For a bed with a wavy edge, use offsets. Run the tape along the length of the bed. At equal steps along the tape, measure the width of the bed square to the tape. Add the widths together and multiply by the step.

For a bed 20 feet long measured every 4 feet, with widths of 3, 5, 6, 4, 2 feet: the widths add up to 20, times 4 is 80 square feet. Closer steps give a closer answer. For most beds a step of 3 to 5 feet is close enough.

A quicker method is to measure the longest and widest points and treat the bed as a rectangle. That always overestimates. A circle or an oval covers 79% of the rectangle drawn around it, so for a rounded bed, multiplying the rectangle by 0.8 gets close.

Slopes

Measure along the ground, not level across. Material follows the surface, so the surface length is the one that counts. On a gentle slope the difference is small. On a steep bank it adds up, and loose material such as pea gravel will also travel downhill, so allow extra.

Measuring depth

For a new bed, the depth is whatever you choose to spread. For a bed that already has material, push a ruler down to the soil in a few places and take the average. If you want 3 inches and 1 inch is still there, order for 2.

For anything dug out, such as a path or a patio base, measure the depth of the excavation in several spots. Ground is rarely flat, and an inch of error over a large area is a lot of material: one inch over 500 square feet is 1.54 cubic yards.

How accurate do you need to be?

Bulk material is usually sold in half-yard steps and bags come whole, so the order is rounded up anyway. Measure to the nearest half foot on small beds and the nearest foot on large areas. Spend the care on depth instead: going from 2 inches to 3 inches adds half again to the order, which no tape error will match.